Six checks before you pay a contractor a cent, using the Companies Office search, the Public Procurement Commission register that replaced the NCC list, registered professionals for drawings, a staged-payment contract and the Building Act inspections.

By Simone Reid, Property & Rebuild Editor · Reviewed 21 Aug 2026

registerSource: Public Procurement Commissionchecked
On this page

After Hurricane Melissa every parish has more rebuild work than honest contractors to do it, and the people paying for much of it live abroad. That is the perfect setting for fraud: a deposit sent by remittance, a foundation poured, and then silence. None of the checks below require a lawyer. They require about a day of work and a refusal to pay in advance.

1. Does the business exist?

Start with the Companies Office of Jamaica (COJ). In April 2026 the COJ publicly urged people to verify a company's registration status before transacting, using the search on its website by the entity's name or registration number. Basic information, including whether a company is active, its registered address and company secretary, is free of cost. If the contractor trades under a business name rather than a company, the same search applies. No record, or a record marked inactive, means you are contracting with an individual, not the firm on the business card.

2. Is the contractor on the public register?

Jamaicans still say NCC, but the National Contracts Commission no longer exists. JIS reported that it was terminated as of 1 April 2019 and that a new Public Procurement Commission (PPC) was established under the Public Procurement Act 2015. The PPC's function, in its own words, is to register and classify persons, firms or entities as suppliers. Its online register can be filtered to Suppliers of Goods and Services, Works Grades 1 to 4, and Grade 5 contractors, and downloaded as a PDF or CSV.

Registration is not trivial. The PPC says firms must be registered with the COJ and be tax compliant to qualify. A PPC entry therefore tells you the contractor is a real, tax-compliant company that has been classified for public works. What it does not tell you is that every unregistered builder is a rogue: registration is required to tender for government contracts above the competition thresholds set by the Ministry of Finance (its Circular 5 of June 2025 is linked from the PPC site), so a good private builder may simply never have needed it. JaRanks' verified contractor listings link to the PPC entry we matched; open the link and check the name yourself.

3. Who is drawing the plans?

A building application needs architectural and engineering drawings, and a house rebuilt without them is a house rebuilt without anyone calculating the roof connections. The Architects Registration Board publishes a list of architects licensed to practise for 2026 with registration and licence numbers. The Professional Engineers Registration Board publishes its register of engineers with the discipline each is registered for, civil, structural, electrical and so on, with a condition that they practise only in those categories. Ask the contractor who will sign the drawings and look both names up.

4. The contract

Get it in writing. A usable building contract names the parties exactly as registered with the COJ, attaches the approved drawings and a priced bill of quantities, states start and completion dates, and sets a payment schedule tied to finished stages rather than calendar dates. A reasonable structure for a small house is a modest mobilisation payment, then payments on completion of foundation, belt course, roof frame, roof covering and finishes, each released only after you or someone acting for you has seen the work. A quantity surveyor can certify each stage if you are overseas. Put in writing who buys materials and who owns surplus.

5. The permit and the inspections

The Building Act 2018 came into force on 15 January 2019 and repealed the old Kingston and St. Andrew and Parish Councils building laws. The Ministry of Local Government says the local authorities act as building authorities and enforce the Act together with the Bureau of Standards. Local Authorities of Jamaica states that once a building application is submitted, mandatory inspections cover steel work, foundation and belt course erection. Ask the municipal corporation how each inspection is requested and keep the record; Local Authorities of Jamaica publishes a Building Application Guide, and our building permit guide walks through the application itself.

Insist that the permit is in your name. A contractor who holds the approval holds your house.

6. The paper trail

Keep every receipt, photograph and message in one folder, dated. If the job goes wrong, the record is what a lawyer, the police or the Consumer Affairs Commission will ask for first. If you are abroad, have someone you trust photograph each stage before you release money, and never accept photographs supplied only by the person asking to be paid.

Warning signs

  • Pressure to pay the full price up front because of material prices.
  • A price with no bill of quantities behind it.
  • No registered architect or engineer on the drawings.
  • A permit the contractor will not show you, or one in the contractor's name.
  • A company name that does not match the COJ record.

What JaRanks cannot do

JaRanks cannot guarantee any contractor's work, confirm their financial standing, or recover money paid. A register entry means the name matched a public list on the date shown; it is not an endorsement. Contract terms are between you and the builder, and for anything above a small job you should have an attorney read the contract before you sign.

Steps

  1. Confirm the business exists

    Search the Companies Office of Jamaica online by name or registration number. The COJ says basic information, including whether a company is active, its registered address and company secretary, is free of cost. A contractor who cannot be found, or whose company is inactive, has no legal standing to sign your contract.

    Agency
    Companies Office of Jamaica
    Cost
    Free
  2. Check the Public Procurement Commission register

    The old National Contracts Commission ceased to exist on 1 April 2019; contractor registration now sits with the PPC. Its online list can be filtered to Works Grades 1 to 4 and Grade 5 contractors and downloaded. Registration requires COJ registration and tax compliance, so a PPC entry is a strong signal. Many competent small builders are not registered because they never tender for government work, so treat absence as a prompt for more checks, not a verdict.

    Agency
    Public Procurement Commission
  3. Get drawings from a registered professional

    Building applications need architectural and structural drawings. Check the architect against the Architects Registration Board's list of architects licensed to practise for 2026 and the engineer against the Professional Engineers Registration Board register, which shows the discipline each engineer is registered for.

    Agency
    Architects Registration Board and Professional Engineers Registration Board
  4. Sign a written contract with a bill of quantities and staged payments

    The contract should name the parties as registered, attach the drawings and a priced bill of quantities, fix a start and completion date, and tie each payment to a finished and inspected stage such as foundation, belt course, roof frame and roof covering. Keep the deposit small and never pay the balance in advance of work.

  5. Make sure the building permit and inspections are real

    The Building Act 2018, in force since 15 January 2019, makes the municipal corporation the building authority. Local authority inspections of steel work, foundation and belt course are mandatory once an application is submitted. Ask to see the permit in your name and the record of each inspection as the stages are reached.

    Agency
    Municipal Corporation (local authority)
  6. Keep a file

    Receipts, photographs, messages and inspection records. If a dispute arises you will need to show what was agreed, what was paid and what was built.

Questions people ask

Is there still an NCC register of contractors?

No. JIS reported that the National Contracts Commission was terminated as of 1 April 2019 and replaced by the Public Procurement Commission under the Public Procurement Act 2015. The PPC publishes the current register of registered suppliers and works contractors, filterable by grade, at ppc.gov.jm. The old ncc.gov.jm domain shows only a placeholder page.

My contractor is not on the PPC list. Should I walk away?

Not automatically. PPC registration is required to tender for government contracts above the competition thresholds set by the Ministry of Finance (its Circular 5 of June 2025 is linked from the PPC site). Private builders who never bid on public work may not register. Run the other checks: COJ search, registered professionals for the drawings, a written staged contract and a permit in your name.

Who is responsible for the building permit?

The owner is. Permission is issued by the municipal corporation as the local building authority under the Building Act 2018. Let the contractor or architect prepare the application, but the permit should be in your name so you, not the contractor, control it.

What inspections happen during construction?

Local Authorities of Jamaica states that once a building application is submitted, mandatory inspections cover steel work, foundation and belt course erection. Local Authorities of Jamaica publishes a Building Application Guide; ask your municipal corporation how each inspection is requested and keep a record of every one.

Sources

  1. registerSource: Public Procurement Commissionchecked
  2. Suppliers RegistrationGovernment page
    government pageSource: Public Procurement Commissionchecked
  3. official newsSource: Jamaica Information Servicechecked
  4. official newsSource: Jamaica Information Servicechecked
  5. government pageSource: Ministry of Local Government and Community Developmentchecked
  6. The Building Act, 2018Law or regulation
    lawSource: Houses of Parliament of Jamaicachecked
  7. Building InspectionGovernment page
    government pageSource: Local Authorities of Jamaicachecked
  8. registerSource: Architects Registration Board of Jamaicachecked
  9. Registered EngineersOfficial register
    registerSource: Professional Engineers Registration Boardchecked

More rebuild guides

  • Government relief programmes after Melissa
    Updated 21 Aug 2026Simone Reid
  • Rebuilding a roof after Hurricane Melissa
    Updated 21 Aug 2026Simone Reid
  • Solar and backup power for a Jamaican home
    Updated 21 Aug 2026Simone Reid